Skip to main content

STEPS IN DEVELOPING MIS

Preliminary Investigation

In this phase, the agency needs to critically assess its current system in order to justify the cost and time involved before deciding on having a new MIS. The facilitator needs to clarify the MIS need not always involve computers. However, if there are computers the work gets accelerated.

Requirements Analysis

The facilitator discusses the methods and means of ascertaining the information needs to be addressed by MIS. Further, the mechanisms for gathering information from primary and secondary sources are to be determined by agencies. A critical factor is ascertaining MIS needs of primary and secondary users.

System Design

The facilitator explains basics of a MIS system elucidating the inputs, the processing and the outputs. While inputs include information provided by front-line workers, the outputs could be various types of reports, including those sent periodically to funders. The procedures define how and in what format the information will be inputted and by whom and at what intervals. The storage could be manual or electronic or both. Design specifies the operational parameters at a drawing board stage. One of the inputs for MIS could be information from a client database.

Other stages

The facilitator systematically discusses the different steps in MIS development in a universalized perspective. In other words, it needs to be specified that these steps need to be tailored to one’s own situation. In the acquisition stage, hardware is procured after appraisals and cost analysis. Draw attention to the need to ensure compatibility between what is being acquired and what is already available within the agency. The implementation step is a crucial one consuming considerable amount of time in MIS development. Here the application development is done customized to the agency’s needs. The procedure and user manuals are developed and personnel are oriented in using MIS.The software is installed once it is tested and debugged.

Comments

Popular posts from this blog

Advantages and Disadvantages of EIS Advantages of EIS Easy for upper-level executives to use, extensive computer experience is not required in operations Provides timely delivery of company summary information Information that is provided is better understood Filters data for management Improves to tracking information Offers efficiency to decision makers Disadvantages of EIS System dependent Limited functionality, by design Information overload for some managers Benefits hard to quantify High implementation costs System may become slow, large, and hard to manage Need good internal processes for data management May lead to less reliable and less secure data

Inter-Organizational Value Chain

The value chain of   a company is part of over all value chain. The over all competitive advantage of an organization is not just dependent on the quality and efficiency of the company and quality of products but also upon the that of its suppliers and wholesalers and retailers it may use. The analysis of overall supply chain is called the value system. Different parts of the value chain 1.  Supplier     2.  Firm       3.   Channel 4 .   Buyer

Big-M Method and Two-Phase Method

Big-M Method The Big-M method of handling instances with artificial  variables is the “commonsense approach”. Essentially, the notion is to make the artificial variables, through their coefficients in the objective function, so costly or unprofitable that any feasible solution to the real problem would be preferred, unless the original instance possessed no feasible solutions at all. But this means that we need to assign, in the objective function, coefficients to the artificial variables that are either very small (maximization problem) or very large (minimization problem); whatever this value,let us call it Big M . In fact, this notion is an old trick in optimization in general; we  simply associate a penalty value with variables that we do not want to be part of an ultimate solution(unless such an outcome is unavoidable). Indeed, the penalty is so costly that unless any of the  respective variables' inclusion is warranted algorithmically, such variables will ...